Skip to main content
IHETC Business

IHETC Business

Training and compliance — construction and public works

A construction site is a temporary organisation: teams change, firms follow one another, and the memory of what was done leaves with them. The issue is therefore not initial training but the continuity of evidence from one site to the next.

What is actually at stake

A construction site is a temporary organisation: teams change, firms follow one another, and the memory of what was done leaves with them. The issue is therefore not initial training but the continuity of evidence from one site to the next.

Actual sum of the relevant fields, not a sales estimate.

modules ready to deploy
187
fields involved
3

No client has yet agreed to be named. We will not invent one.

case studies published
0

Where these modules come from

The volume stated is not a round number: it is the sum of the fields attached to this sector. Here they are, in detail.

Industry & HSE
140 (75 %)
HR & management
15 (8 %)
Entrepreneurship
32 (17 %)
Total: 187 modules ready to deploy

What you must be able to demonstrate

A training measure that is not recorded does not exist on inspection day. The list below is the real specification — content comes second.

  • A recorded safety induction for every newcomer, including a two-day job
  • Authorisations specific to high-risk work: height, electricity, lifting, trenching
  • Proof that the information was understood, not merely circulated
  • A history that follows the person from site to site, not from employer to employer

A typical rollout

The order matters: starting with trade content before the induction base produces incomplete audit files, and that is the most common mistake.

  1. 01

    1 — Rapid site induction

    Short format, doable on a phone before the first shift. A two-hour induction never delivered is worth less than a twenty-minute one always delivered.

  2. 02

    2 — High-risk work

    Height, lifting, electricity, plant. Targeted by actual activity, with assessment before authorisation.

  3. 03

    3 — Site management

    Coordinating parties, managing overlapping works, keeping the register. Coordination is the leading accident factor on a shared site.

Fields drawn on

These fields already exist in the catalogue. Anything tied to your own procedures is produced from your documents, in weeks.

Industry, safety and HSE — 140

Health, safety, environment and industrial plant operation. It covers the real risks of a site: electrical, mechanical, chemical, fire, work at height, confined spaces — and how to document them so an inspection can verify them.

Human resources and management — 15

Recruitment, HR administration, team leadership and skills development. The field connects two functions wrongly kept apart: managing contracts and helping people grow.

Business and entrepreneurship — 32

Starting and running a business: business model, pricing, operations, funding, growth. The field starts from a real activity, often already trading, rather than a theoretical business plan.

What we cannot do here

We replace neither hands-on plant training, nor equipment inspection, nor the role of an appointed safety coordinator. Our scope is people's competence and the evidence of it.

Sector questions

Our workers change monthly. Is this workable?

That is precisely the use case. The induction triggers on arrival, runs on a phone in about twenty minutes, and the result stays attached to the person: if they return to another site six months later, their history is already there and you do not pay twice for the same training.

Many of our teams struggle with written French.

That is a real and common constraint. Induction content favours audio, imagery and scenarios over text, and can be produced in the site's national languages. Training that assumes fluent reading excludes part of the very people it addresses.

Training and compliance — construction and public works — IHETC Business | IHETC — IHETC